Window installation process: from preparation to finishing
Quality installation guarantees that the plastic window will perform its functions: providing thermal, noise, and moisture insulation for the room.
Stage 1: Preparation for Installation
Preparatory Work includes:
Replacing furniture or protecting it with film
Cleaning the work area
Preparing tools and materials
Protecting the floor covering
Stage 2: Old Window Dismantling
Dismantling Process:
Removing window sashes
Dismantling the frame and drip molding
Removing the old windowsill
Cleaning the opening from old sealant and debris
Stage 3: New Window Installation
Installation Sequence:
Checking the new structure’s condition
Removing glass units and sashes
Installing the frame in the opening
Leveling
Securing the frame with anchor bolts or plates
Installing sashes and glass units
Sealing joints with монтажной пеной
Stage 4: Finishing Touches
Final Work:
Sealing joints and slopes
Installing the windowsill
Adjusting hardware
Removing protective film
For installation you’ll need:
Installation foam
Vapor-permeable and vapor-proof sealants
Fastening elements
Level and measuring tools
Protective film
Points to Consider:
Opening geometry must match window dimensions
Maintain technological gaps
Apply Installation foam evenly
Hardware requires mandatory adjustment
Post-Installation Checks:
Seal integrity
Smooth operation of sashes
Proper hardware installation
Absence of distortions
Proper PVC window installation is a complex technological process requiring professional approach and adherence to all stages. Only then can you guarantee the durability and efficiency of the window structure.