Window installation process: from preparation to finishing

Quality installation guarantees that the plastic window will perform its functions: providing thermal, noise, and moisture insulation for the room.

Stage 1: Preparation for Installation

Preparatory Work includes:

  • Replacing  furniture or protecting it with film
  • Cleaning the work area
  • Preparing tools and materials
  • Protecting the floor covering

Stage 2: Old Window Dismantling

Dismantling Process:

  • Removing window sashes
  • Dismantling the frame and drip molding
  • Removing the old windowsill
  • Cleaning the opening from old sealant and debris

Stage 3: New Window Installation

Installation Sequence:

  • Checking the new structure’s condition
  • Removing glass units and sashes
  • Installing the frame in the opening
  • Leveling
  • Securing the frame with anchor bolts or plates
  • Installing sashes and glass units
  • Sealing joints with монтажной пеной

Stage 4: Finishing Touches

Final Work:

  • Sealing joints and slopes
  • Installing the windowsill
  • Adjusting hardware
  • Removing protective film

For installation you’ll need:

  • Installation foam
  • Vapor-permeable and vapor-proof sealants
  • Fastening elements
  • Level and measuring tools
  • Protective film

Points to Consider:

  • Opening geometry must match window dimensions
  • Maintain technological gaps
  • Apply Installation foam evenly
  • Hardware requires mandatory adjustment

Post-Installation Checks:

  • Seal integrity
  • Smooth operation of sashes
  • Proper hardware installation
  • Absence of distortions

Proper PVC window installation is a complex technological process requiring professional approach and adherence to all stages. Only then can you guarantee the durability and efficiency of the window structure.




uPVC Windows and Doors in Egypt. Any color of turn, tilt and turn, tilt sliding, sliding, parallel sliding system, arched non standard PVC windows. Mosquito nets, roller and lower shutter, jalousie in double glass or triple glazing by Super Spacer technology. Painted and bend uPVC profile, stained glass. Painting and bending PVC profile WINSA Carina, Vela. Maintenance and Repairing
Eco House Joint Stock Company partner of Deceuninck Group | Copyright 2009-2025. All rights reserved.
E-mail: info@ecohouse-eg.com, tel.: +201212288828

Site www.ecohouse-eg.com is for informational purposes only and under no circumstances is not a public offer. For more information on the cost of materials, products and services, please contact the sales offices